Here is the timeline of major events during the restoration. Follow the associated links to learn. |
|
12/02/2007 | The Madness Continues |
12/19/2007 - 01/05/2008 | Interior Taredown |
01/10/2008 - 02/13/2008 | Final Taredown |
02/01/2008 | All Things Matching |
02/18/2008 - 03/08/2008 | Roof Clip |
03/22/2008 - 10/25/2008 | Floors & Rocker Panels |
10/26/2008 - 11/22/2008 | Rear Suspension |
12/22/2008 - 02/09/2009 | Left Inner Rocker Panel Replacement |
12/22/2008 - 02/17/2009 | Right Inner Rocker Panel Replacement |
02/26/2009 - 05/05/2009 | Floors |
05/06/2009 - 05/27/2009 | LH Door Reskinning |
05/30/2009 - 06/22/2009 | Bonnet Taredown |
08/01/2009 | RH Rear Wing Replacement |
09/12/2009 - 10/17/2009 | Trunk Tub Replacement |
10/31/2009 - 12/12/2009 | Roof, Left and Right Sides |
12/26/2009 - 03/13/2010 | Bonnet Sheetmetal |
03/17/2010 - 03/20/2010 | Bonnet Gluing |
03/20/2010 - 03/29/2010 | Electroplateing Bonnet Hardware |
03/29/2010 - 03/31/2010 | Bonnet Assembly |
04/03/2010 | Bonnet Installation |
04/24/2010 - 05/17/2010 | Sill End Panel Installation |
04/24/2010 - 06/02/2010 | Left Rear Wing Installation |
06/03/2010 - 06/30/2010 | Blocking |
07/19/2010 - 09/04/2010 | Painting Part I |
09/13/2010 - 10/02/2010 | Painting Part II |
10/05/2010 - 10/22/2010 | Painting Part III |